Brothers Leagues Club

We installed a new BMS system in conjunction with H & H Air Conditioning and Rohrig constructions. The Innotech BMS System had over 300 new points with a full graphics package and user interface for our clients. We also have the ability to remote login to the BMS system for maintenance and the ability to download graphs on how the system has been preforming.

Peak Voltage also installed a new mechanical switchboard to house all the new control equipment and all the power requirements for the new equipment.

The project took 6 months to complete.