Essential Energy – Port Macquarie

Peak Voltage was contracted by both H&H Airconditioning & Future Fitouts for a joint venture in the fit out of the new Essential Energy in Port Macquarie.

 

The project involved returning two separate buildings back to base build, consisting of basement car parks and 2-3 levels of offices in each building

Peak Voltage assisted in the demolition of both buildings with making safe and removal of redundant cabling, removal of old switchboards and MSSBs

New lights, general power and air conditioning circuits were then re-installed throughout the project.

 